""With Beev, we were able to equip our sites and employees with a modern, reliable and supervised recharging solution. The support was seamless at every stage, from advice to installation, with high-quality technical monitoring.
![]()
Ghislain Quinet Procurement Manager
Les défis rencontrés par Xylem Group
- Deploy a fleet of multi-site kiosks in a harmonised manner
- Offering employees a reliable, high-performance recharging solution
- Guarantee OCPP supervision to optimise fleet management
- Rely on a single partner to centralise installations and monitoring
Ce que Beev a mis en place pour Xylem Group
-
Installation of Copper SB Wallbox terminals
40 terminals installed at several sites in France.
-
OCPP supervision
Setting up a centralised system to control and optimise the use of the terminals.
-
Multi-site deployment
Coordinated management of facilities throughout the country.
-
Technical and operational support
Personalised support, from installation to commissioning.
Les résultats
-
40 Copper SB Wallboxes installed
-
25 sites equipped and supervised
-
100 % satisfied employees